Dominion’s ACP Supply Header Project (401 Certification)

by Duane Nichols on November 3, 2017

RE: Dominion’s Supply Header Project for the ACP

Overview
Dominion Energy Transmission, Inc. is proposing to construct and operate approximately 37.5 miles of natural gas pipeline and modify existing compression facilities in West Virginia and Pennsylvania. The project, referred to as the Supply Header Project (SHP), will provide natural gas supplies to various customers, allowing the transport of natural gas from supply areas in Ohio, Pennsylvania and West Virginia to market areas in Virginia and North Carolina.

Visit the new Atlantic Coast Pipeline site and the Supply Header Project section for the latest information.

Quick Facts
Length: Approximately 37.5 miles of natural gas pipeline loop (3.9 miles of pipe in Pennsylvania and 33.64 miles of pipe in West Virginia)
Pipe Diameter: 30 inch in Pa.; 30 inch in W. Va.
Capacity: 1.5 million dekatherms per day
Compressor Station and Facility Upgrades:
Pennsylvania: JB Tonkin Station, Westmoreland County; Crayne Station, Greene County
West Virginia: Mockingbird Hill Station, Wetzel County; Burch Ridge Station, Marshall County

######################################

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

From: WV Department of Environmental Quality
Date: October 31, 2017 at 10:09:09 AM EDT
Subject: WV-DEP Public Notice – General WV/ Water Pollution Control Permit Application – Harrison County – Dominion Energy Transmission, Inc.

=========================================
Tuesday, October 31, 2017 @ 10:08 AM
=========================================

State of West Virginia
Department of Environmental Protection
Division of Water and Waste Management

PUBLIC NOTICE –

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION’S, PUBLIC INFORMATION OFFICE, 601 57TH STREET SE, CHARLESTON, WEST VIRGINIA 25304-2345 TELEPHONE: (304) 926-0440.

APPLICATION FOR COVERAGE UNDER THE GENERAL WEST VIRGINIA WATER POLLUTION CONTROL PERMIT NO. WV0115924

Public Notice No.: SM-45-2017 Public Notice Date: November 03, 2017

Paper: The Exponent/Telegram of Clarksburg, WV

The following has applied for coverage under the General WV/ Water Pollution Control Permit No. WV0115924 for this facility or activity:

Appl. No.: WVR310846

Applicant: DOMINION ENERGY TRANSMISSION, INC.
707 E. MAIN STREET, RICHMOND, VA 23219

Location: HARRISON COUNTY

Latitude: 39:10:16 Longitude: 80:33:37

Receiving Stream:
UNT/Tanner Fork/Tanner Fork/Kinchcloe Creek/West Fork River/Monongahela River

Activity:
This application is for the construction of approximately 33.6 miles of 30-inch diameter pipeline, a new metering station, and compressor stations. The project will disturb approximately 668.7 acres of land crossing Doddridge, Tyler, and Wetzel Counties.

Business conducted: Industrial

On the basis of review of the application the “Water Pollution Control Act (Chapter 22, Article 11-8(a)),” and the “West Virginia Legislative Rules,” the State of West Virginia will act on the above application.

Any interested person may submit written comments on the site registration permit application and may request a public hearing by addressing such to the Director of the Division of Water and Waste Management within 30 days of the date of the public notice. Such comments or requests should be addressed to:

Director, Division of Water and Management, DEP
ATTN: Sharon Mullins, Permitting Section
601 57th Street SE
Charleston, WV 25304-2345

The public comment period begins November 03, 2017 and ends December
03, 2017.

Comments received within this period will be considered prior to acting on the permit application. Correspondence should include the name, address and the telephone number of the writer and a concise statement of the nature of the issues raised. The Director shall hold a public hearing whenever a finding is made, on the basis of requests, that there is a significant degree of public interest on issues relevant to the site registration permit application and this facility’s coverage under the General Permit. Interested persons may contact the Public Information Office to obtain further information.

The application may be inspected, by appointment, at the Division of Water and Waste Management Public Information Office, at 601 57th Street SE, Charleston, WV, between 8:00 a.m. and 4:00 p.m. on business days. Copies of the application and the General Permit and Fact Sheet may be obtained from the Division at a nominal cost. Individuals requiring Telecommunication Device (TDD) may contact our agency by calling (304) 926-0493. Calls must be made 8:30 a.m. to 3:30 p.m. Monday through Friday.

===========================================

NOTE: The Monongahela River will receive the total dissolved solids (TDS) and suspended solids resulting from the Supply Header Pipeline as specified above. The Mon River is a primary water supply to Morgantown and other cities and facilities. And, the Mon River already exceeds levels of 250 ppm TDS frequently. Duane Nichols

Leave a Comment

Previous post:

Next post: